Replacement of the Quincy Pump Station MWRA Contract #5407 Quincy, Massachusetts
Owner: Mass. Water Resources Authority
Construction Schedule: January, 2001 to November, 2002
Contact: Mr. Michael Delprete, Construction Coordinator
Construction & Design Cost: $6,900,000
Project Manager: Joseph Gioioso
Scope of Services: Construction of 26 mgd sewage pumping station including cast-in-place concrete foundation with a masonry and wood framed superstructure. The pumps are controlled by a PLC-based instrumentation and control system and variable frequency drives. Work included a 25 foot deep excavation supported by steel sheeting, 24" interior piping and valves, complete HVAC, Electrical, and Plumbing systems, and site work.