FILTRATION PLANT, PUMPING STATION
COOLING WATER PIPELINE AND SEWER 1999-2000


Contact:   Millenium Power, Charlton, MA (private)

Construction & Design Cost:   $5,716,600.00

Project Manager:   Marco Gioioso



Scope of Services:   Construction of Twin 16" & 12" D.I. Cooling Water Supply and return pipelines for the millennium power plant. Work included 5 tunnel crossings, two pumping stations and a water filtration plant for the effluent from the Southboro Wastewater Treatment Plant. Also included the drilling and blasting of 7,000 cubic yards of trench rock through environmentally sensitive areas and through an active industrial park that had vibration sensitive equipment.