WATER TREATMENT FACILITY, Contract No. 2
City of Holyoke, Massachusetts


Owner: Board of Water Commissioners

Construction Schedule:  1995 - 1997

Contact:   Mr. David Conti, Manager

Construction & Design Cost:   $9,780,000

Project Manager:   Joseph Bettencourt



Scope of Services:   Work included construction of a water treatment facility building, a 192' x 130' x 16' high cast in place concrete water contact basin, two (2) 3.0 mg water storage tank foundations (176± ' diameter each), two 2 mg water storage tank foundations (132±' diameter each), 10,000 lf of 42", 30", 24" and 16" yard piping, two dam spillways, a 24' wide paved access road and site landscaping. Approximately 6,000 cy of cast in place concrete, 46,000 cy of rock excavation and 55,000 cy of earth excavation were included in the construction of the project.