Scope of Services: Work on the project included construction of sanitary sewers, storm drains, flush vaults, pre-cast box storage tank, pumping stations, roadway surface enhancements, traffic controls and landscaping Fresh Pond Parkway and Concord Ave.
Five (5) drain vaults with flushing mechanisms, two (2) pumping stations, 140 lf of 8' x 10' storage box structure, six (6) special structures, two (2) sanitary vaults, and 10,000 cy of contaminated soils handling were included in the project.